Loading…
Demo
Invented data. Only you see your changes.
Reset
✕
Turnaround Wallchart
Calder Bay Complex
U14
▾
Wallchart
Log Activity
RR Log
Rolling Log
Inspectors
Admin
Log activity
WL
Wallchart
Log Activity
RR Log
Rolling Log
Inspectors
Admin
Locations
Calder Bay Complex
U14
RR Log
One continuous sequence across the whole site — RR # order is written order, numbers are never reused.
Export CSV
Log activity
Total
3
Filtering
Partial
0
Filtering
Awaiting supervisor review
0
Filtering
Awaiting client
0
Filtering
Client approved
0
Filtering
Client deferred
0
Filtering
Lead deferred
0
Filtering
Closed
3
Filtering
Filter:
Last 24 hours
Last 7 days
Last month
All
All asset types
Drums
PSV Pull
All equipment
D-1425
PSV-14306
PSV-14308
All causes
Mechanical damage
Corrosion
Erosion
Cracking
Tube plugging
Other
Not tagged
3 of 3 - numbers never reused
Generate report
RR #
Unit
Equipment
Asset type
Finding
EWO #
Written by
Written
Stage
Status
RR-018-D-1425
U14
D-1425
Drums
IRIS on 20% of tubes found 6 tubes with wall loss over 40% at the inlet end, rows 1 and 2.
—
Marcus H.
4/21/26
Repair verified & closed
—
RR-019-PSV-14308
U14
PSV-14308
PSV Pull
WFMT found a 1.5 in. linear indication at the toe of the N3 nozzle-to-shell weld.
—
Hollis B.
4/24/26
Repair verified & closed
—
RR-020-PSV-14306
U14
PSV-14306
PSV Pull
Trays 14 and 15 have two dislodged valve caps and one bent support beam.
—
Megan F.
4/27/26
Repair verified & closed
—