Rolling log
13 entriesHollis B.of 248
| Inspection details | |||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|
| 5/6/26 | Days | Hollis B. | Exchangers | E-1408A Naphtha Cooler | Channel (Bonnet) | Final QA complete | — | — | — | — | |
| 5/6/26 | Days | Hollis B. | Drums | D-1443 Wash Water Drum | — | Final QA complete | — | — | — | — | |
| 5/5/26 | Days | Hollis B. | Drums | D-1428 Reflux Drum | — | Final QA complete | — | — | — | — | |
| 5/4/26 | Days | Hollis B. | Drums | D-1416 Flash Drum | — | Final QA complete | — | — | — | — | |
| 5/3/26 | Days | Hollis B. | Exchangers | E-1406B Trim Cooler | Shell | Final QA complete | — | — | — | — | |
| 4/30/26 | Days | Hollis B. | Exchangers | E-1405A Reboiler | Channel (Bonnet) | UTT complete | — | — | — | — | |
| 4/25/26 | Days | Hollis B. | Drums | D-1443 Wash Water Drum | — | WFMT complete. No cracking found | — | — | — | — | |
| 4/24/26 | Days | Hollis B. | Drums | D-1410 Crude Charge Surge Drum | — | UTT complete. Gaskets surfaces good | — | — | — | — | |
| 4/21/26 | Days | Hollis B. | Drums | D-1428 Reflux Drum | — | UTT complete | — | — | — | — | |
| 4/20/26 | Days | Hollis B. | Drums | D-1434 Blowdown Drum | — | External Visual complete. Minor general corrosion, within allowance | — | — | — | — | |
| 4/15/26 | Days | Hollis B. | Exchangers | E-1404A Feed / Effluent Exchanger | Shell | VI complete | — | — | — | — | |
| 4/15/26 | Days | Hollis B. | Drums | D-1440 Compressor Suction KO | — | Internal Visual complete | — | — | — | — | |
| 4/14/26 | Days | Hollis B. | PSV Pull | PSV-14302 | — | PSV Removed complete. Coating intact | — | — | — | — |