Loading…
Demo
Invented data. Only you see your changes.
Reset
✕
RR log report — U14 — Wallchart
← Back to the RR log
Standard page
Large page (11×17)
Internal copy
Download PDF
Laying out the pages…
Your Inspection Co.
Repair Recommendation Log — Calder Bay Complex · U14
· 4/11/26 – 5/8/26
Every RR to date
RRs in this report
3
Awaiting client
0
Client approved
0
Client deferred
0
Closed
3
Repair Recommendations in this report
RR #
Equipment / package
Asset type
Finding
EWO #
Written by
Written
Stage
Status
RR-018-D-1425
D-1425
Drums
IRIS on 20% of tubes found 6 tubes with wall loss over 40% at the inlet end, rows 1 and 2.
—
Marcus H.
4/21/26
Repair verified & closed
—
RR-019-PSV-14308
PSV-14308
PSV Pull
WFMT found a 1.5 in. linear indication at the toe of the N3 nozzle-to-shell weld.
—
Hollis B.
4/24/26
Repair verified & closed
—
RR-020-PSV-14306
PSV-14306
PSV Pull
Trays 14 and 15 have two dislodged valve caps and one bent support beam.
—
Megan F.
4/27/26
Repair verified & closed
—
Turnaround Wallchart · Calder Bay Complex · U14 · Every RR to date · Generated 11/23/26 · Generated live from the digital wallchart.