Your Inspection Co.
API Inspection / Repair Recommendation
| Site | Calder Bay Complex | RR # | RR-003-E-2104A |
|---|---|---|---|
| Equipment ID | E-2104A | ||
| Process Description | BEU U-tube | ||
| Inspector | Dwayne P. | ||
| Date of Finding | 11/13/26 | ||
| EWO / Client WO # | — |
FINDINGS:
During the 2026 U21 Turnaround, visual inspection of E-2104A (BEU U-tube) — Channel (Bonnet) revealed: WFMT found a 1.5 in. linear indication at the toe of the N3 nozzle-to-shell weld.
RECOMMENDATIONS:
Grind out and re-inspect. If the indication remains past 1/8 in., repair per the weld procedure and re-test.
JUSTIFICATION(S):
No justification recorded.
PHOTO REFERENCE:
No photos attached.