Your Inspection Co.
API Inspection / Repair Recommendation
| Site | Calder Bay Complex | RR # | RR-010-E-2103B |
|---|---|---|---|
| Equipment ID | E-2103B | ||
| Process Description | BEU U-tube | ||
| Inspector | Marcus H. | ||
| Date of Finding | 11/17/26 | ||
| EWO / Client WO # | — |
FINDINGS:
During the 2026 U21 Turnaround, visual inspection of E-2103B (BEU U-tube) — Floating Head revealed: IRIS on 20% of tubes found 6 tubes with wall loss over 40% at the inlet end, rows 1 and 2.
RECOMMENDATIONS:
Plug the 6 tubes and expand IRIS to 100% of rows 1 to 3.
JUSTIFICATION(S):
No justification recorded.
PHOTO REFERENCE:
No photos attached.