Drums
D-2158
Horizontal vessel with boot
In progress
0 RRs · 0 open
Administrative notes
Internal only.
Wallchart — D-2158
Click a cell to sign it or add a note. A red pill is an RR — click it to open.
1 of 1 items · click a cell to edit, drag a column edge to resize
| Equip # | Equipment Name | Work Order | Description | Progress | Scope | Status | Internal Visual | External Visual | UTT | WFMT | Flanges VI | Final QA | Repair Recommendation (RR) | Repair Complete | Comments |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| D-2158 | Overhead Accumulator | WO-48480 | Horizontal vessel with boot | Internal + external VI, UTT grid, WFMT nozzles | Ready for inspection | RC 11/12 No recordable indications | OS 11/14 | DP 11/15 No recordable indications | GW 11/17 | RC 11/20 | Delayed. Insulation not stripped | · | ○︎ | ○︎ |