Exchangers
E-2112B
AES shell and tube
Closed outRenee T. — locked
1 RR · 1 open
Closed out — this record is locked. Cell edits, log entries and new RRs are off until an admin reopens it.
Administrative notes
Internal only.
Wallchart — E-2112B
Click a cell to sign it or add a note. A red pill is an RR — click it to open.
1 of 1 items · click a cell to edit, drag a column edge to resize
| Equip # | Equipment Name | Work Order | Description | Progress | Scope | Component | Status | VI | Flanges VI | ECT/RFT/IRIS | UTT | Final QA | Repair Recommendation (RR) | Repair Complete | Comments |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| E-2112B | Overhead Condenser | WO-48681 | AES shell and tube | Closed out | Pull bundle, VI all components, IRIS 20% tubes | Channel (Bonnet) | Boxed up | RC 11/12 Gaskets surfaces good | GW 11/14 | N/A | DP 11/18 No cracking found | MF 11/22 | · | ○︎ | ○︎ |
| WO-48681 | Shell | WD 11/12 No cracking found | GW 11/14 Light scale, no pitting | N/A | WD 11/18 | MH 11/22 | · | ○︎ | ○︎ | ||||||
| WO-48681 | Tube Bundle | GW 11/11 | MH 11/14 | MH 11/17 | RC 11/18 | KJ 11/21 | RR-009-E-2112B | ○︎ | ○︎ | ||||||
| WO-48681 | Floating Head | MF 11/11 | DP 11/14 Light scale, no pitting | N/A | GW 11/19 | GW 11/21 | · | ○︎ | ○︎ |