Exchangers
E-2128A
AES shell and tube
In progress
0 RRs · 0 open
Administrative notes
Internal only.
Wallchart — E-2128A
Click a cell to sign it or add a note. A red pill is an RR — click it to open.
1 of 1 items · click a cell to edit, drag a column edge to resize
| Equip # | Equipment Name | Work Order | Description | Progress | Scope | Component | Status | VI | Flanges VI | ECT/RFT/IRIS | UTT | Final QA | Repair Recommendation (RR) | Repair Complete | Comments |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| E-2128A | Naphtha Cooler | WO-48239 | AES shell and tube | Pull bundle, VI all components, IRIS 20% tubes | Channel (Bonnet) | Cleaned | MF 11/11 | TR 11/14 | N/A | OS 11/18 | Delayed. Insulation not stripped | · | ○︎ | ○︎ | |
| WO-48239 | Shell | MF 11/12 | CV 11/13 | N/A | GW 11/19 | In progress. AK 11/22 about half done | · | ○︎ | ○︎ | ||||||
| WO-48239 | Tube Bundle | MF 11/12 No cracking found | AK 11/14 No cracking found | TR 11/16 | DP 11/19 | In progress. TR 11/22 readings in progress | · | ○︎ | ○︎ | ||||||
| WO-48239 | Floating Head | KJ 11/12 Minor general corrosion, within allowance | DP 11/15 Minor general corrosion, within allowance | N/A | RC 11/20 | In progress. MF 11/22 top half complete | · | ○︎ | ○︎ |