Log Activity
RR Log
Rolling Log
Inspectors
Admin
Log activity
WL
Wallchart
Log Activity
RR Log
Rolling Log
Inspectors
Admin
Locations
Calder Bay Complex
U21
RR Log
One continuous sequence across the whole site — RR # order is written order, numbers are never reused.
Export CSV
Log activity
Total
17
Filtering
Partial
1
Filtering
Awaiting supervisor review
3
Filtering
Awaiting client
3
Filtering
Client approved
5
Filtering
Client deferred
2
Filtering
Lead deferred
1
Filtering
Closed
2
Filtering
Filter:
Last 24 hours
Last 7 days
Last month
All
All asset types
Drums
Exchangers
Fin Fans
Heaters
PSV Pull
Pipe & Valves
All equipment
8"-P-2138-C1
D-2110
D-2164
D-2194
E-2103B
E-2104A
E-2109B
E-2110A
E-2111A
E-2112B
E-2115B
E-2118B
E-2129A
EA-2111
EA-2114
H-2102
PSV-21378
All causes
Mechanical damage
Corrosion
Erosion
Cracking
Tube plugging
Other
Not tagged
3 of 17 - numbers never reused
Generate report
RR #
Unit
Equipment
Asset type
Finding
EWO #
Written by
Written
Stage
Status
RR-012-D-2164
U21
D-2164
Drums
Trays 14 and 15 have two dislodged valve caps and one bent support beam.
—
Kendra J.
11/18/26
Awaiting supervisor review
—
RR-013-EA-2114
U21
EA-2114
Fin Fans
Pitting across the gasket seating face of the channel flange, deepest 0.060 in.
—
Rusty C.
11/19/26
Awaiting supervisor review
—
RR-014-EA-2111
U21
EA-2111
Fin Fans
About 12 sq ft of spalled castable on the north radiant wall, anchors exposed.
—
Wes D.
11/19/26
Awaiting supervisor review
—