Exchangers
E-2111A
AEL fixed tubesheet
Discovery in progressRepair
1 RR · 1 open
Administrative notes
Internal only.
Wallchart — E-2111A
Click a cell to sign it or add a note. A red pill is an RR — click it to open.
1 of 1 items · click a cell to edit, drag a column edge to resize
| Equip # | Equipment Name | Work Order | Description | Progress | Scope | Component | Status | VI | Flanges VI | ECT/RFT/IRIS | UTT | Final QA | Repair Recommendation (RR) | Repair Complete | Comments |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| E-2111A | Crude / Diesel Exchanger | WO-48631 | AEL fixed tubesheet | 1 open RR | Pull bundle, VI all components, IRIS 20% tubes | Channel (Bonnet) | Inspection complete | AK 11/11 No cracking found | AK 11/14 | N/A | ○︎ | ○︎ | RR-015-E-2111A | ○︎ | ○︎ |
| WO-48631 | Shell | GW 11/11 | KJ 11/14 No recordable indications | N/A | ○︎ | ○︎ | · | ○︎ | ○︎ | ||||||
| WO-48631 | Tube Bundle | MF 11/11 Gaskets surfaces good | OS 11/14 | In progress. MF 11/22 about half done | ○︎ | ○︎ | · | ○︎ | ○︎ | ||||||
| WO-48631 | Floating Head | LO 11/11 Minor general corrosion, within allowance | RC 11/14 Light scale, no pitting | N/A | ○︎ | ○︎ | · | ○︎ | ○︎ |