Exchangers
E-2129A
AEL fixed tubesheet
In progress
1 RR · 0 open
Administrative notes
Internal only.
Wallchart — E-2129A
Click a cell to sign it or add a note. A red pill is an RR — click it to open.
1 of 1 items · click a cell to edit, drag a column edge to resize
| Equip # | Equipment Name | Work Order | Description | Progress | Scope | Component | Status | VI | Flanges VI | ECT/RFT/IRIS | UTT | Final QA | Repair Recommendation (RR) | Repair Complete | Comments |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| E-2129A | Desalter Preheat | WO-48192 | AEL fixed tubesheet | Pull bundle, VI all components, IRIS 20% tubes | Channel (Bonnet) | Cleaned | AK 11/12 No recordable indications | MF 11/13 | N/A | In progress. CV 11/22 about half done | ○︎ | · | ○︎ | ○︎ | |
| WO-48192 | Shell | HB 11/11 | HB 11/13 | N/A | In progress. MH 11/22 about half done | ○︎ | · | ○︎ | ○︎ | ||||||
| WO-48192 | Tube Bundle | MH 11/12 No cracking found | HB 11/14 Gaskets surfaces good | HB 11/16 | In progress. HB 11/22 about half done | ○︎ | · | ○︎ | ○︎ | ||||||
| WO-48192 | Floating Head | GW 11/13 | OS 11/14 | N/A | In progress. MF 11/22 about half done | ○︎ | RR-007-E-2129A | ○︎ | ○︎ |