Exchangers
E-2140A
AEL fixed tubesheet
Discovery in progressIn progress
0 RRs · 0 open
Administrative notes
Internal only.
Wallchart — E-2140A
Click a cell to sign it or add a note. A red pill is an RR — click it to open.
1 of 1 items · click a cell to edit, drag a column edge to resize
| Equip # | Equipment Name | Work Order | Description | Progress | Scope | Component | Status | VI | Flanges VI | ECT/RFT/IRIS | UTT | Final QA | Repair Recommendation (RR) | Repair Complete | Comments |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| E-2140A | Steam Generator | WO-48348 | AEL fixed tubesheet | Pull bundle, VI all components, IRIS 20% tubes | Channel (Bonnet) | Ready for inspection | PN 11/11 Gaskets surfaces good | DP 11/13 | N/A | ○︎ | ○︎ | · | ○︎ | ○︎ | |
| WO-48348 | Shell | MH 11/12 | HB 11/12 Light scale, no pitting | N/A | ○︎ | ○︎ | · | ○︎ | ○︎ | ||||||
| WO-48348 | Tube Bundle | DP 11/12 Gaskets surfaces good | AK 11/13 Gaskets surfaces good | In progress. RC 11/22 top half complete | ○︎ | ○︎ | · | ○︎ | ○︎ | ||||||
| WO-48348 | Floating Head | LO 11/11 | CV 11/13 | N/A | ○︎ | ○︎ | · | ○︎ | ○︎ |