Exchangers
E-2115B
BEU U-tube
Repair
1 RR · 1 open
Administrative notes
Internal only.
Wallchart — E-2115B
Click a cell to sign it or add a note. A red pill is an RR — click it to open.
1 of 1 items · click a cell to edit, drag a column edge to resize
| Equip # | Equipment Name | Work Order | Description | Progress | Scope | Component | Status | VI | Flanges VI | ECT/RFT/IRIS | UTT | Final QA | Repair Recommendation (RR) | Repair Complete | Comments |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| E-2115B | Reboiler | WO-48682 | BEU U-tube | 1 open RR | Pull bundle, VI all components, IRIS 20% tubes | Channel (Bonnet) | Ready for inspection | MH 11/11 Light scale, no pitting | MF 11/13 | N/A | WD 11/18 Gaskets surfaces good | In progress. KJ 11/22 about half done | · | ○︎ | ○︎ |
| WO-48682 | Shell | CV 11/11 Minor general corrosion, within allowance | DP 11/15 | N/A | WD 11/18 | In progress. GW 11/22 about half done | · | ○︎ | ○︎ | ||||||
| WO-48682 | Tube Bundle | PN 11/11 | DP 11/14 | LO 11/17 Light scale, no pitting | HB 11/19 No cracking found | Delayed. Bundle not pulled yet | · | ○︎ | ○︎ | ||||||
| WO-48682 | Floating Head | CV 11/11 Minor general corrosion, within allowance | GW 11/15 Gaskets surfaces good | N/A | MF 11/20 Coating intact | In progress. WD 11/22 top half complete | RR-006-E-2115B | ○︎ | ○︎ |